Marriot Hotel

Project
Marriot Hotel
Owner
City of Flagstaff
EMC Role
Subcontractor
Engineer
WLB Engineering

Project Overview

Site development for the Marriot Hotel. The limestone soil conditions and the proximity to I-17 and I-40 required the site be profiled to accomplish the nearly 60,000 CY of excavation. Much of the resulting material was used for backfill and site fill areas. The Project consisted of:

  • 60,000 CY of cut / fill
  • Site Utilities
  • Site Concrete
  • 80,000 SF of asphalt